Croydon Hills Primary School

PVC Barrel Vault

This basketball cover has given Croydon Hills students somewhere to play all year round, whatever the weather! The space is used for sport, PE, and assembly’s and has had great feedback from staff and students alike.

KEY DESIGN ADVANTAGES
Underground plumbing to existing pit network.
Bay spacings adjusted to maintain access to existing storage shed doors.

AREA COVERED
Existing Basketball Court

SIZE
33m x 19.6m

STEEL FINISH
Powder Coated, Dune

FABRIC COVER
Mehler FR900, White

BRIEF
The leadership team at Croydon Hills Primary School wanted to refresh their existing sports court area to increase learning options for staff and students and demonstrate their commitment to providing the highest quality facilities for their school community.  The final desired outcome for the project was to include new surfacing throughout, along with the installation of new sports hoops. It was important to achieve all year round access to the courts, with waterproof coverage and excellent natural light transmission to maintain the outdoors ambience of the space.  Being a waterproof structure also meant that rainwater would need to be connected to existing stormwater systems.

 

OUTCOME
Greenline provided a full design and construct package to complete the structure which included obtaining building permits, installing underground stormwater, and installing new basketball and netball hoops for the school. The minimalist structural design eliminates risks of bird-roosting issues and provides a very clean visual finish to the space. Greenline ensured access to the existing adjacent shed was maintained by careful location of columns away from the swinging gate entry points. Footings were finished below the existing surface level to ensure that the new synthetic surfacing achieved a perfect finish around the columns. The school staff and students love their new space and it is used on a daily basis for all different uses!

Who worked on this project?

Greenline worked to our time line and delivered as per the spec. Their work was what was expected.

MBS PTY LTD - Mark Conroy

Friendly, professional communications and extensive help provided in the grant application process as well as excellent execution of the project.

Barnawartha Primary School - Bernadette Kelly

Extremely easy to deal with. Professional service. Very happy with the completed job.

Echuca East Primary School, Jodi Boal

I find engaging with Greenline completely professional. The customer service is exemplary and the three projects I have been involved in with Greenline gives me confidence in their communication, ability to meet deadlines and appease a customer, quality of work, competency in meeting regulations and OHS measures

I have great confidence in this team/company.

Wodonga Primary School - Damian Duncan - Principal

I have used Greenline for a number of years now as I have always found them to provide excellent customer service, great quality and reliability. Our most recent project was a covered walkway to provide extra shelter for our students.

From day one, the walkway was such a big hit, with so many students using it that we actually had to provide extra staff in the area for additional student supervision. Thank you Greenline.

Wyndham Central College - Bryan Wollard - Assistant Principal

From my first meeting with a Greenline representative I was very impressed with the professional presentation about the company.

The process relating to construction was very well explained with timelines, contractors details and

Overall, the finished product is absolutely great. It has exceeded all our expectations and is now a real asset for the school.

Greenline did a great job here and I would recommend them to any school wanting to develop a COLA.

Ardeer Primary School - Graham Miller - Principal

Greenline were a pleasure to deal with. Their communication was excellent and we are thrilled with the end product.

Mount Waverley Heights Primary School - Sharon Reiss-Stone - Principal

A huge thank you and congratulations to the team at Greenline for delivering BIG TIME our outdoor shade shelter. The shelter, which covers one of our outdoor basketball courts, gives our students a chance to play through all weather conditions and looks great. Their post project support has been fantastic with quick follow-ups and service to the school.

Croydon Hills Primary School - Christian Holdsworth - Principal

We found Greenline to be professional throughout our entire business relationship, from our initial communications through to the completion of our project. Their friendly, helpful advice was offered with constant consideration of our needs. Greenline were able to meet all deadlines with competency, completing our project with the highest quality of work.

Bundoora Primary School - Lee Pollard - Principal

Greenline were a professional and well organised company to work with. The finished product was of a high standard and met the school’s requirements.

Wiley Park Public School - logo

Wiley Park Public School - Rene Demos - Principal
Sports court cover Sports court cover Sports court cover Sports court cover Sports court cover Sports court cover