Waverley College 

PVC Barrel Vault

This stunning Rooftop PVC structure has provided the students at Waverley College with all weather use of their multi purpose sports courts, atop The Cosgrove Centre building.

KEY DESIGN ADVANTAGES
9% light transmission
All-weather use

AREA COVERED
Rooftop Basketball Court

SIZE
23.5m x 36m

STEEL FINISH
Powder Coated in White

FABRIC COVER
Ferrari 802S PVC in White

Brief

Waverley College had a unique situation where they wanted a shade structure to cover a competition size Basketball Court that was located on the roof of their gymnasium. It was very important to the College that they could maximise every available playing space for the students so that the College could make the most out of the space without any of the area going to waste.

Outcome

Waverley College opted for one of Greenline’s popular structures being the PVC Membrane Barrel Vault. One of the benefits of this structure is that it allows 9% light transmission into the area allowing for the feel of outdoor ambience while still providing full weatherproof protection. Students can play in any weather, in any conditions, in any season. This structure was able to double the floorspace for the PD/H/PE Department while still allowing for outdoor lessons and play regardless of the weather. The Greenline team’s experience helped work through some unique challenges with the construction of this project. Being that it was on a busy main road, limited space available between buildings in regard to access and that it was to be built on the roof of their gymnasium all made this more interesting to build than a conventional site!
Introducing structural smarts to reduce the load onto the rooftop slab helped reduce the overall cost of construction for the client, and the project was completed on-time, on-budget.

Meet the team that worked on this project.

Greenline worked to our time line and delivered as per the spec. Their work was what was expected.

MBS PTY LTD - Mark Conroy

Friendly, professional communications and extensive help provided in the grant application process as well as excellent execution of the project.

Barnawartha Primary School - Bernadette Kelly

Extremely easy to deal with. Professional service. Very happy with the completed job.

Echuca East Primary School, Jodi Boal

I find engaging with Greenline completely professional. The customer service is exemplary and the three projects I have been involved in with Greenline gives me confidence in their communication, ability to meet deadlines and appease a customer, quality of work, competency in meeting regulations and OHS measures

I have great confidence in this team/company.

Wodonga Primary School - Damian Duncan - Principal

I have used Greenline for a number of years now as I have always found them to provide excellent customer service, great quality and reliability. Our most recent project was a covered walkway to provide extra shelter for our students.

From day one, the walkway was such a big hit, with so many students using it that we actually had to provide extra staff in the area for additional student supervision. Thank you Greenline.

Wyndham Central College - Bryan Wollard - Assistant Principal

From my first meeting with a Greenline representative I was very impressed with the professional presentation about the company.

The process relating to construction was very well explained with timelines, contractors details and

Overall, the finished product is absolutely great. It has exceeded all our expectations and is now a real asset for the school.

Greenline did a great job here and I would recommend them to any school wanting to develop a COLA.

Ardeer Primary School - Graham Miller - Principal

Greenline were a pleasure to deal with. Their communication was excellent and we are thrilled with the end product.

Mount Waverley Heights Primary School - Sharon Reiss-Stone - Principal

A huge thank you and congratulations to the team at Greenline for delivering BIG TIME our outdoor shade shelter. The shelter, which covers one of our outdoor basketball courts, gives our students a chance to play through all weather conditions and looks great. Their post project support has been fantastic with quick follow-ups and service to the school.

Croydon Hills Primary School - Christian Holdsworth - Principal

We found Greenline to be professional throughout our entire business relationship, from our initial communications through to the completion of our project. Their friendly, helpful advice was offered with constant consideration of our needs. Greenline were able to meet all deadlines with competency, completing our project with the highest quality of work.

Bundoora Primary School - Lee Pollard - Principal

Greenline were a professional and well organised company to work with. The finished product was of a high standard and met the school’s requirements.

Wiley Park Public School - logo

Wiley Park Public School - Rene Demos - Principal