KEY DESIGN ADVANTAGES
No equipment, materials or machines on the green at any point during construction
Efficient LED lighting in accordance with Australian Standards
End infills for weather protection
COLORBOND® half-round gutters and circular downpipes with connection to the stormwater system

 

INDUSTRY
Recreation

AREA COVERED
Existing bowling green

SIZE
42.9m x 44m

FINISH
Interpon three-coat paint system for C3 medium corrosivity region in ‘Dune’

COVER
Mehler FR900, white PVC

Calliope Central Bowls Club

BRIEF Calliope Central Bowls Club came to Greenline with the vision of covering their green to provide year-round, day and night lawn bowls with a cyclone-proof membrane structure. The site was challenging with limited access around the green for large construction equipment, and a client preference for no access onto the green at any point during construction. Cyclonic wind conditions meant that the structure needed to be certified for extremely strong wind events.

OUTCOME Calliope Central Bowls Club will be the only one in the Gladstone region that will have a permanent roof. It allows competitions to be scheduled well in advance without the worry of weather. The club is building a strong focus on getting the local community involved with barefoot bowls and social events, so it is more than simply a bowling club – it is a local destination.
The curved roof structure was designed to withstand the massive loads from cyclones and was constructed from curved circular steel members and high-tech premium waterproof PVC membrane. The membrane offers 100% UVR block for a safe playing environment for all ages while allowing 9% natural light transmission to reduce the need for artificial lighting during the day. The structure has efficient LED lighting for evening events, and a PA system to extend the buildings public address into the area. The project was conducted with a unique methodology with zero access to the green at any point during construction.

Greenline worked to our time line and delivered as per the spec. Their work was what was expected.

MBS PTY LTD, Mark Conroy

Friendly, professional communications and extensive help provided in the grant application process as well as excellent execution of the project.

Barnawartha Primary School - Bernadette Kelly

Extremely easy to deal with. Professional service. Very happy with the completed job.

Echuca East Primary School, Jodi Boal

I find engaging with Greenline completely professional. The customer service is exemplary and the three projects I have been involved in with Greenline gives me connfidence in their communication, ability to meet deadlines and appease a customer, quality of work, competency in meeting regulations and OHS measures

I have great confidence in this team/company.

Wodonga Primary School, Damian Duncan