Project Details

Who: Rules Club Wagga
Industry: Commercial
Area covered: Carpark and walkway
Size: Carpark 40m x12m, Walkway 35mx5m
Finish: Powdercoated Dulux Duralloy Berry Grey
Cover: FR700 White Pvc Membrane

 

Key Design Advantages:

Integrated lighting
Integrated CCTV
Rain water drainage
Ads visual interest to the buildings

Share:

Wagga Rules Club

Brief:

The design brief was to link the existing club building and new hotel with ‘a playful element’ a visually appealing walkway structure, and provide a similar style structure over the car parking behind the hotel. The walkway structure needed to create a big visual impact from the road, and to provide a visual tie and waterproof linkway between the two different style buildings. The “hypar” shape twisted roof was a key element in both structures, as were the tall masts.

The structures needed to integrate lighting and stormwater collection, as well as CCTV. Column locations needed to minimise interruption with the car parks while still maximising coverage over the walkway, and maintaining minimum clearances for truck access under the walkway. The project was to be run as a turnkey design and construct process, with Greenline appointed to work as nominated subcontractor under the head builder.

The early architect concepts were buildable, but very expensive to realise. We utilised our 4D discovery process to find out which elements of the design were important to them, and what the key functional outcomes were. These outcomes were then brought together in a sensational structure for a lower cost than the original design.

Outcome:

The hypar twisted shape of the cover is a key element of both structures. Alternating steel above and below the membrane provides visual interest. Integrated circular rainwater heads and stainless steel downpipes catch the water from the roofs and integrated LED lighting provides illumination for both the walkways and adjacent car parks.

Talk to us today for ideas and estimates on how to transform your outdoor spaces!

Projects

No items were found matching the selected filters
Government

Birriwa Reserve Camden, NSW

Case Study
Education

Sirius College Stage Two (Keysborough)

Case Study
Sports & Recreation

Arora's IGA Georges Hall

Case Study
Education | Sports & Recreation

Laurimar Primary School

Case Study
Government | Sports & Recreation

Chiltern Swimming Pool

Case Study
Sports & Recreation

Calliope Central Bowls Club

Case Study
Sports & Recreation

Sports Facility

Case Study
Education

Loreto Mandeville Hall - Toorak

Case Study
Load more

Greenline worked to our time line and delivered as per the spec. Their work was what was expected.

MBS PTY LTD, Mark Conroy

Friendly, professional communications and extensive help provided in the grant application process as well as excellent execution of the project.

Barnawartha Primary School - Bernadette Kelly

Extremely easy to deal with. Professional service. Very happy with the completed job.

Echuca East Primary School, Jodi Boal

I find engaging with Greenline completely professional. The customer service is exemplary and the three projects I have been involved in with Greenline gives me confidence in their communication, ability to meet deadlines and appease a customer, quality of work, competency in meeting regulations and OHS measures

I have great confidence in this team/company.

Wodonga Primary School, Damian Duncan

I have used Greenline for a number of years now as I have always found them to provide excellent customer service, great quality and reliability.

I have had a number of shade sails installed by Greenline and our most recent project was a covered walkway to provide extra shelter for our students.

From day one, the walkway was such a big hit, with so many students using it that we actually had to provide extra staff in the area for additional student supervision. Thank you Greenline.

Wyndham Central College - Bryan Wollard - Assistant Principal

From my first meeting with a Greenline representative I was very impressed with the professional presentation about the company as well as the work they would do and service they would provide if they were to construct our COLA project.

The process relating to construction was very well explained with timelines, contractors details and security and safety measures put in place. Communication throughout the project was regular and informative. Contractors working on site were very co-operative and professional whilst performing their construction tasks.

Overall, the finished product is absolutely great. It has exceeded all our expectations and is now a real asset for the school.

Greenline did a great job here and I would recommend them to any school wanting to develop a COLA.

Ardeer Primary School - Graham Miller - Principal