KEY DESIGN ADVANTAGES
Stunning curved roof profiles
Integrated rainwater handling of both
stages of work
Large span with extra high clearance
Amazing natural light transmission
Fully engineered and certified project

 

INDUSTRY
Education

AREA COVERED
Existing synthetic sports court

SIZE
31.8m x 46m

FINISH
Prime coated and powdercoated ‘Dune’

COVER
Mehler FR900, white PVC membrane

 

Sirius College – Stage Two
Keysborough, VIC

BRIEF Following on from our successful Stage 1 project
providing waterproof cover to one of the College’s
basketball court, Greenline were re-engaged to
complete the planned Stage 2 structure. As this
extended from the columns on the southern edge of
the basketball court structure, accuracy and attention-
to-detail were critical to ensure a seamless intergration
between the two structures. Key outcomes for Stage 2
were to avoid damage to the existing synthetic surface
and to link through to existing covered walkway areas for
truly all-weather access. 

OUTCOME The two completed projects have minimsed
the risk to the College by dealing with Greenline as the
one end-to-end design and construct provider. Having
been involved right from the earliest phase of Stage 1 we
were able to stage the projects to suit budget require-
ments while optimising the design to maximise the over-
all project value for money. With 660m2 already under
roof in Stage 1, the completed Stage 2 structure provides 
an additional 1460m2 of coverage – an amazing College
with amazing ‘Spaces to Grow’!

Projects

No items were found matching the selected filters
Government

Birriwa Reserve Camden, NSW

Case Study
Education

Sirius College Stage Two (Keysborough)

Case Study
Sports & Recreation

Arora's IGA Georges Hall

Case Study
Education | Sports & Recreation

Laurimar Primary School

Case Study
Government | Sports & Recreation

Chiltern Swimming Pool

Case Study
Sports & Recreation

Calliope Central Bowls Club

Case Study
Sports & Recreation

Sports Facility

Case Study
Education

Loreto Mandeville Hall - Toorak

Case Study
Load more

Greenline worked to our time line and delivered as per the spec. Their work was what was expected.

MBS PTY LTD, Mark Conroy

Friendly, professional communications and extensive help provided in the grant application process as well as excellent execution of the project.

Barnawartha Primary School - Bernadette Kelly

Extremely easy to deal with. Professional service. Very happy with the completed job.

Echuca East Primary School, Jodi Boal

I find engaging with Greenline completely professional. The customer service is exemplary and the three projects I have been involved in with Greenline gives me confidence in their communication, ability to meet deadlines and appease a customer, quality of work, competency in meeting regulations and OHS measures

I have great confidence in this team/company.

Wodonga Primary School, Damian Duncan

I have used Greenline for a number of years now as I have always found them to provide excellent customer service, great quality and reliability.

I have had a number of shade sails installed by Greenline and our most recent project was a covered walkway to provide extra shelter for our students.

From day one, the walkway was such a big hit, with so many students using it that we actually had to provide extra staff in the area for additional student supervision. Thank you Greenline.

Wyndham Central College - Bryan Wollard - Assistant Principal

From my first meeting with a Greenline representative I was very impressed with the professional presentation about the company as well as the work they would do and service they would provide if they were to construct our COLA project.

The process relating to construction was very well explained with timelines, contractors details and security and safety measures put in place. Communication throughout the project was regular and informative. Contractors working on site were very co-operative and professional whilst performing their construction tasks.

Overall, the finished product is absolutely great. It has exceeded all our expectations and is now a real asset for the school.

Greenline did a great job here and I would recommend them to any school wanting to develop a COLA.

Ardeer Primary School - Graham Miller - Principal